Sunday, July 1st we drove up to Commerce City to check on the progress of our home. As you can see the outside is painted (Yeah, it's yellow!!) and the rock and tree's are in. I'm not a big fan of rock, but Todd has promised me that eventually we'll replace it all with mulch and flowers.
This is the second bathroom that our girls will be using. They had all the hardware in, the mirrors, sinks, faucets, everything! The only thing missing is the shelving in the closets.
This is the front entrance area. To the right of this picture is where the study is.
I'm so excited about the doors in my home. Aren't they pretty!?!
Our set closing date is July 20th, but the final walk through in July 13th. That means everything should be finished that weekend and then we point out anything we feel needs to be fixed before we close. Wish us luck!
This is the second bathroom that our girls will be using. They had all the hardware in, the mirrors, sinks, faucets, everything! The only thing missing is the shelving in the closets.
This is the front entrance area. To the right of this picture is where the study is.
I'm so excited about the doors in my home. Aren't they pretty!?!
Our set closing date is July 20th, but the final walk through in July 13th. That means everything should be finished that weekend and then we point out anything we feel needs to be fixed before we close. Wish us luck!
No comments:
Post a Comment